Slideshow: Dodd Parking Garage

A view of Dodd Parking Garage from Medical Center and Old Cannon drives.
The west entrance, located on Old Cannon Drive, will include in, out and reversible lanes.
Crews have installed wooden form work for the concrete on the seventh floor.
Blue cables on the sixth floor are post-tension cables and will provide structural stability in the concrete.
Teams remove wood forms, which act as a mold for the concrete column.
A picture of the north entrance from Medical Center Drive.
A view of the Wexner Medical Center from the sixth level of the garage.

Mechanical and electrical plumbing system installation continues at Dodd Parking Garage, which is now 70% complete. Teams have poured concrete on six of seven levels of the facility, located on the corner of Medical Center and Old Cannon drives. The project will create parking spots for 1,100 vehicles. 

Additional construction activities include:

  • Pouring concrete on the elevator machine roof.
  • Masonry work in stairwell lobbies.
  • Installation reinforcement through level six.
  • Completion of concrete slab placement on level five.

The Dodd Parking Garage, located within walking distance of the Wexner Medical Center, is expected to open in June. View the photo slideshow above to track the project’s progress or view live construction feeds.