Main navigation

Slideshow: Campbell Hall

  • A view of a construction worker installing framing
    A view of the teaching kitchen area where crews are continuing to install framing.
  • A large, empty room with a construction worker standing in it.
    A classroom on the first floor.
  • A view of a room under construction where the hallway can also be seen.
    A view of the costume gallery area on the first floor.
  • A view from the second floor looking down to the first.
    A view from the second floor looking down to the community space.
  • A view of a large, open area under construction with a dirt floor.
    The community space on the first floor.

    The Campbell Hall Renovation project is nearing 25% completion as crews continue their facelift on the historic building. A variety of specialty crews are in and out of the building each day including electricians, plumbers, carpenters and heating, ventilation and air conditioning professionals, among others. It’s a team effort as they work on a variety of things including installing in-wall rough-ins, concrete pours, roof demos and building information model (BIM) sign offs. 

    The project renovates 115,000 square-feet of existing offices, research and computer labs, teaching kitchen, department and pool classrooms and collaborative areas.