The Ohio State University is building the campus of the future to support teaching, learning and research.
In conjunction with Ohio State’s strategic plan and Framework, the university’s long-term planning vision, key projects are emerging across the Columbus campus. Explore the future of Ohio State’s physical footprint below.
Active Projects
Wexner Medical Center Inpatient Hospital

Planning Vision

Framework
The Ohio State University’s Framework Plan is a roadmap that guides decisions about how the Columbus campus will develop and transform over the next several decades.

Strategic Plan
Our strategic plan is a living framework that allows for flexibility moving forward.

Ohio State Wexner Medical Center Strategic Plan
To further Ohio State's aspiration, the medical center has developed a multifaceted strategic plan that advances the university's Academic Health Care goal and will continue our history of success.
Construction News
-
Slideshow: Campbell Hall
The Campbell Hall Renovation project is nearing 25% completion as crews continue their facelift on the historic building.
-
In the News: Inside Look at Ohio State's New Hospital Tower
NBC4 recently got an inside look at The Ohio State University Wexner Medical Center Inpatient Hospital.
-
Slideshow: Biomedical and Materials Engineering Complex Phase 2
Work on the Biomedical and Materials Engineering Complex (BMEC) Phase 2 is passing the halfway point, at nearly 53% complete. Crews are preparing to pour the second interior stairwell and then will be able to remove the exterior temporary set.