News
In the News: A Luminous Lab at Ohio State Models Renewable Energy Strategies
Architectural Record recently highlighted the 64,000-square-foot Energy Advancement and Innovation Center (EAIC).
Olentangy Trail Reroute Adjusted During Ohio Stadium Events in April
Multiple events will take place at Ohio Stadium in April. During these events, the Olentangy Trail reroute around Ohio Stadium will be moved east to Tuttle Park Place. As area event preparations occur and event-related traffic increases, the adjustment will be in place beginning the morning before the event.
April Events
Slideshow: Cannon Drive Stormwater Detention System
A stormwater detention system with the ability to hold up to seven acre-feet (more than two million gallons) of storm water is being installed at the Cannon Drive Relocation – Phase 2 site.
Slideshow: Campbell Hall
Demolition and abatement are complete at Campbell Hall where crews are now preparing to begin Mechanical, Electrical, and Plumbing rough-ins and begin reconstruction of the interior, which includes preserving some of the original elements of the building.