The main entrance to the Wexner Medical Center inpatient hospital is taking shape as steel framing continues in preparation for glass installation. Structural steel is up to level 15 and the concrete structure of the middle elevator tower is approaching level 25. The 1.9 million-square-foot hospital is the largest single facilities project ever undertaken at Ohio State.
Slideshow: Inpatient Hospital
