Columbus Underground recently highlighted the Cannon Drive Relocation Phase 2 project, which rebuilds the roadway between John Herrick Drive and Woody Hayes Drive and constructed a certified ODNR floor protection levee.
News
-
-
In the News: Ohio State University is building a dairy in Columbus
As highlighted by the American School and University, The Ohio State University is building a state-of-the-art dairy facility at the College of Food, Agricultural, and Environmental Sciences (CFAES) Waterman Agricultural and Natural Resources Laboratory.
-
In the News: New Center Furthers the Legacy of Hamilton Hall and its Role in Revolutionizing Academic Medicine
As highlighted by The Ohio State University College of Medicine, Hamilton Hall is making history by serving as the home of the new Interdisciplinary Health Sciences Center (IHSC). A ribbon cutting was held in the forum to celebrate the opening of the IHSC. More celebrations are planned for the fall and during the October Homecoming weekend.
-
Olentangy Trail, Pedestrian Bridge Reopen
The Sisson Hall pedestrian bridge and the Olentangy Trail have reopened. Access to campus from the trail is available at Woody Hayes Drive and 12th Avenue. By early September, additional connections between the trail and campus, south of the Sisson Hall pedestrian bridge, will open. Progress continues on the Cannon Drive – Phase 2 project.
-
Ohio State Builds a Resilient Flood Protection Levee
If you’ve driven past Cannon Drive this summer, you’re bound to have noticed either the large hole in the ground, the massive concrete stormwater chambers being installed, or a variety of construction equipment. It’s all in the name of a 500-year flood protection plan.